Project Overview
The Lekki Free Zone — a 16,000-hectare industrial and logistics hub on Lagos' eastern corridor — is home to Nigeria's flagship Lekki Deep-Sea Port, major manufacturing facilities, and international industrial tenants. Envostructs was engaged by the Lekki Free Zone Development Company (LFZDC) to design and construct two key internal road corridors: Road N5 and Road E6A. These roads form part of the zone's permanent internal network, serving industrial plants, warehouses, and logistics operations within the free trade zone. The roads were designed for extreme heavy-vehicle loadings — accommodating port vehicles, oversized industrial equipment, and the demanding operational environment of an active port and manufacturing estate within the Lekki peninsula's coastal reclaimed terrain.
See The Work
Construction footage — The New Onilegbale Palace, Lagos Island (2025)
Project Gallery
Challenges & Solutions
Challenges
- Designing for extreme heavy-vehicle loadings — port vehicles, factory trucks, and oversized industrial equipment
- Construction on coastal reclaimed land — managing weak subgrade conditions on the Lekki peninsula's sandy/alluvial soils
- Coordinating construction around active industrial operations without disrupting the zone's ongoing development
- Drainage design adequate for Lagos' intense coastal rainfall on low-lying reclaimed land
Our Solutions
- Heavy-duty pavement design with deep sub-base and base course layers for port and industrial vehicle loads
- Ground improvement works — compaction and sub-base strengthening to stabilize the reclaimed coastal land subgrade
- Phased construction plan separating works zones from live industrial and logistics operations throughout
- Comprehensive storm drainage network designed for 1-in-25-year storm event on the coastal low-lying terrain
Key Features
Project Information
Client
Lekki Free Zone Development Company (LFZDC)
Project Manager
Engr. A.D. Onitilo
Duration
18 months
Completion Year
2019
Status
CompletedTechnical Specifications
Project Timeline
Survey, Design & BOQ Preparation
3 months
CompletedSite Clearing & Earthworks
4 months
CompletedSub-base & Base Course Construction
6 months
CompletedAsphalt, Drainage & Road Furniture
5 months